
Description of our 300BPH 5 gallon filling line
How to find a suitable bucket filling machine?
1. The gallon barrels used are all new gallon barrels? Or recycled
old barrels? If it's new, do you need a bottle blow molding
machine?
2. Do the gallon barrels have a handle? And wha's the shape is
it?Is the cover press-cap or screw-cap?
3. The volume of barrel is 3 gallons or 5 gallons ?
3 gallon bucket filling machine/system/unit 3 in 1 auto loading | |||
Items | Name of machine | Model | Size(mm) |
1 | De-capper | BG-1 | 800*600*1950 |
2 | Auto external brush washer | WX-3 | 1500*1100*2200 |
3 | Monoblock rinser-filler-capper with Auto loading and un-loading
device | CGF-300 | 5000*1500*2000 |
4 | Light checker | / | / |
5 | Cap film shrink tunnel | / | 1200*450*1200 |
6 | Conveyor system | 10m belt+2m roller+2 motor | / |
De-capper:
When the gallon bottle comes into the machine, the block board will
block the bottle tightly by cylinder,the de-capping head will go
down and claw device will hold tightly barrel cap sides, and then
lift the barrel to take off the caps; And when the caps are taken
off, the compressor air will blow the caps into cap hopper, then
fall outside into client's own holder.
Parameters | |
Cap pulling claw | 1 pc |
Power | 0.8KW |
Dimension | 650*800*1600mm |
Weight | 100kg |
Rinser-filler-capping:
The Barrel water filling machine set up do not need plug floor
screw,after case taking off,set the machine on the flat floor,and
then adjust stand height and adjust all stand pressure to be
average. After the machine is set up well, get in through water
pipe, drain pipe and power , air power.
Parameters | |
Cylinder | Air tech-Taiwan |
Magnetic valve | Air tech-Taiwan |
Rising pump-filling pump | Nanfang |
Motor | TWT Taiwan |
PLC | Mitsubishi Japanse |
Power | 6KW |
Dimension | 4500*1500*2000mm |
Weight | 600kg |
Auto loading device | 1500*800*1000mm |
Weight | 100kg |
Heat Shrinking Machine:
Whole SUS304 construction, Including electrical boiler to generate steam and shrink tunnel specially for barrel cap film
Zhangjiagang City FILL-PACK Machinery Co., Ltd
ZhangJiaGang City FILL-PACK Machinery Co.,Ltd. which was originally set up as an factory in 1999,the company is growing up time by time in research and design, quality and production, sales and after sale service. Our machineries are sold to more than 50 countries in the world and over cross domestic.
We specialize in producing beverage filling-packing equipments and water treatment equipments. The quality already pass drinkable standard.At present we produce: production lines for mineral water, pure water, fruit juice,tea drink,milk drink and carbonated drink with capacity 1000-20000bottles/hour; production lines for vinegar, soy sauce and wine 1000-20000bottles/hour; 3-5 gallon barreled water with capacity 60-1200 barrels per hour and water treatment plants 1-30 ton/hour; We provide separate machinery or turnkey project.
Our products pass quality inspection executed by Bureau of Quality and Technical Supervision every year. We pass Italy CE inspection in 2011;
We have full-time development and design engineer team, we absorb technologies from Germany, Japan, France, Italy, Switzerland, combined with China's national conditions to develop high starting point and advanced technology filling equipments, degree of automation to achieve the advanced level.
We own 3700 square meters modern factory in accordance with ISO9001: 2000 certification system standards with all kinds of advanced processing equipment and testing equipment, experienced technicians, scientific and strict management, all constitute FILLPACK excellence in product manufacturing system, which provides the strongest protection for FILLPACK product quality.
We believe in FILLPACK’ s future while you choose us!